



Fairfield Township:
Asphalt Paving:
Gravel Projects:
Riley Road from Warren
Road west to the blacktop; 0.70 miles.
Eption Road from Warren Road to Meridian Road; 1.00 miles.
Huff/Warren Road from N Warren Road to Epton Road; 0.74 miles.
Sealcoat Projects:
Carland Road from Epton Road to Allan Road; 1.00 miles.